Visit Our Global Site

Xypex was asked to help repair and protect the concrete in the basement parking garage and lift shafts of the EKO Hotel after water leakage caused damage. The basement was built below the water table and is subjected to hydrostatic pressure. The leaks were coming from the floor slab construction joints and most of the edges along the wall to floor and column to floor areas. Xypex Patch'n Plug and Concentrate were used to make these repairs.

DISTRIBUTOR

Send E-mail
nigeria-01
Articles
For more articles, see Articles section on Xypex.com
  • cpi-jun-2010

    Quality Septic Tanks Begin in the Forms

    2010
    Some things are better off left buried and the longer the better. Septic tanks top this list. That’s one of the reasons why ABC Precast & Ready Mix of Nanaimo, British Columbia, has turned to advanced sewage treatment systems to make sure concrete tanks remain the product of choice for residents of British Columbia.

    » Acrobat PDF
  • CPI 2015

    WWTP Upgrade Gets Crystalline Waterproofing Protection

    2015
    As part of a larger sanitary sewer improvements project, Alliance Water Resources is constructing the Sandfort Creek Lift Station in St. Charles, Mo., for East Central Missouri Water and Sewer Authority (ECMWSA), a not-for-profit corporation formed by Public Water Supply District #2 of St. Charles County to provide water and sewer utility services to areas...

    » Acrobat PDF