Back to Search Results
Bridges

Rehabilitation of Road Bridge over Railway

During rehabilitation of the main bridge concrete structures there was used Xypex Admix C-1000NF as a protection against negative effects caused by stray voltage. Xypex was used as dosage 2,0 kg/m3. Total usage was 1040 kg.

1 of 4
During rehabilitation of the main bridge concrete structures there was used Xypex Admix C-1000NF as a protection against negative effects caused by stray voltage. Xypex was used as dosage 2,0 kg/m3. Total usage was 1040 kg.