Union City Body Co. Plant Expansion

Union City, Indiana, USA

Xypex Concentrate DS-2 was applied to 200,000 sq. ft. of a General Motors plant floor. The production facility makes truck chasis and the Xypex was used to protect the floor from oils and cooling fluids. This was a fast track project which required that 35,000 sq. ft. of slab be placed every day.