Centro Hotel, Sharjah Airport

Waterproofing membranes had originally been specified in the elevator pits for this prestigious hotel. Following extensive worldwide use of Xypex in this application, it was decided to use Xypex Admix C-1000 as a more efficient alternative for the ready-mix concrete, together with Xypex Concentrate for joints and tie-holes. After successful flooding-tests, Xypex was then specified and successfully used in water tanks and reservoirs.

1 of 2
Waterproofing membranes had originally been specified in the elevator pits for this prestigious hotel. Following extensive worldwide use of Xypex in this application, it was decided to use Xypex Admix C-1000 as a more efficient alternative for the ready-mix concrete, together with Xypex Concentrate for joints and tie-holes. After successful flooding-tests, Xypex was then specified and successfully used in water tanks and reservoirs.