Project Detail
  • Gabcikovo Dam

    Gabcikovo, Slovakia

    Before repairing and waterproofing the entrances and corridors leading to the water locks of this dam, the concrete surface was first cleaned with a high-pressure cleaning unit. A two-coat application of Xypex Concentrate and Modified was then applied to the surface. Cracks and joints were filled and sealed with Xypex Patch'n Plug.

    BACK

Scroll to top