Xypex Projects

From subway stations to swimming pools, from bridges to buildings, and in foundations, critical infrastructure, and many other applications around the world, explore our always expanding list of Project Profiles to learn how Xypex Crystalline Technology waterproofs, protects and repairs concrete.

Find Projects

1137 results found

Calvert City WWTP Influent Lift Station & Plant Improvements

Calvert City, KY, USA

Xypex Bio-San was specified in the precast elements for the Wastewater Treatment Plant Influent Lift Station and Plant in Calvert City, Kentucky. Forterra Pipe & Precast added Bio-San to a total of 180 cubic yards of treated pre-cast concrete for this project.

Project Sheet
Project Sheet PDF

Mount Royal Tunnel Upgrade

Montreal, Canada

The Mount Royal Tunnel upgrade in Montreal, QC, Canada, required an around-the-clock, seamless operation to address water leaks and patch cavities.

Project Sheet
Project Sheet PDF

MDA Levis - Seniors’ Residence Foundation Waterproofing

St Etienne De Lauzon, QC, Canada

In the strategic rejuvenation of the MDA Levis Seniors’ Residence, the team faced a significant challenge: a compromised raft slab and basement walls due to the failure of an existing membrane waterproofing system. Positioned 4 feet within the water table and enduring a constant hydrostatic pressure of 1.7 psi, the need for a definitive and enduring waterproofing solution was paramount.

Project Sheet
Project Sheet PDF

Zady One Power Station

Berber, Sudan

The Zady One project, located east of Berber City in Sudan's River Nile state, represents a significant advance in agricultural and industrial development. Spanning 1,000,000 Feddan (approximately 4,168.27 km² or 1,609.38 mi²), it is on track to become Sudan's largest integrated project in these sectors, featuring center pivot irrigation. 

Sayga Flour Mills Basement

Khartoum North (Bahri), Sudan

Sayga Flour Mills, the largest flour mill in Sudan and a flagship operation of DAL Group, embarked on a crucial rehabilitation project to address the persistent issue of water infiltration in its basement. This site serves a vital role in distributing flour products throughout Sudan and exporting to neighboring countries. Maintaining the integrity of the facility was paramount. The rehabilitation project spanned from December 2018 to February 2019, focusing on the basement area of the plant located in the industrial heartland of Khartoum North (Bahri).