Xypex Projects
From subway stations to swimming pools, from bridges to buildings, and in foundations, critical infrastructure, and many other applications around the world, explore our always expanding list of Project Profiles to learn how Xypex Crystalline Technology waterproofs, protects and repairs concrete.
Find Projects

JEA Bio Solids Facility
The JEA Buckman Bio Solids Facility required durable concrete protection for new sludge holding tanks and the overhead structural slab exposed to aggressive wastewater conditions. These structures operate under continuous exposure to hydrogen sulphide and microbial activity that can lead to microbial induced corrosion. The project demanded a long-term solution capable of protecting concrete integrity without reliance on surface applied linings or membranes that require ongoing maintenance.

Jiangbei Bridge Concrete Rehabilitation
Jiangbei Bridge is located on Jiangbei Avenue in Ningbo City, Zhejiang Province, and crosses the Yao River. During its construction, it was named Qinglindu Extra Large Bridge, and was later renamed Jiangbei Bridge after completion. The bridge was fully connected on October 30, 1996, and opened to traffic together with Jiangbei Avenue on December 30, 1996.

Hotel Beore
Situated in the picturesque Sun Moon Lake Scenic Area in Taiwan, Hotel Beore is a boutique retreat that artfully combines natural inspiration with architectural elegance. Construction began in January 2021, and after nearly three years of dedicated craftsmanship, the hotel officially opened its doors in October 2023.

PACCAR Cab Storage Facility Expansion
PACCAR, a leading manufacturer of heavy-duty trucks, expanded its Sainte-Thérèse facility to increase storage capacity for finished cab units. The new addition required durable, watertight concrete construction to protect sensitive industrial components and maintain efficient operations throughout the year.

Sea La Vie Hotel
This project is located in Ksamil, Saranda, and consists of the construction of a 4 story hotel building with 2 underground floors, with a basement area of 1200 m2. The location very close to the coastline brought special engineering challenges, due to the difficult terrain conditions and high groundwater levels.